How do I install the panels?
Installation is carried out using adhesive and the tongue-and-groove joint.
First row (most important step)
Start with the bottom row, align the panels so they are level, with the groove facing upwards and outwards, apply adhesive in a zigzag pattern with a border all round, press the panel firmly against the wall and remove any excess adhesive immediately whilst it is still wet. Click each panel firmly into the previous one; complete the entire bottom row first and allow it to cure completely before continuing with the next rows.
Corners and final panels
In corners without a finishing profile, saw off the tongue. When installing with a profile: first apply adhesive to the profile and allow it to cure, after which the panels can simply be cut to size and installed.
Subsequent rows & top row
Repeat for each row; where the panels meet the ceiling, remove the tongue and groove and finish with silicone or an end profile.
Damp and wet areas (bathroom/shower)
In damp and wet areas, apply silicone to all joints, tongue-and-groove connections and along the edges to ensure a completely watertight finish; sealing correctly is simple but crucial.